Assessing the effects of thermal bridging at junctions and around openings
Assessing the effects of thermal bridging at junctions and around openings (IP 1/06) was written by T I Ward and published by BRE in March 2006.
This 6-page paper gives guidance on assessing the effects of thermal bridging at junctions and around openings in the external elements of buildings and how to assess their effect on heat loss or heat gain. It enables estimation of these heat transfers for building regulations compliance calculations. It supports the building regulations for the conservation of fuel and power in all three jurisdictions within the UK. The guidance is primarily intended for junction and opening details that are not as recommended in 'Accredited construction details' or MCRMA/EPIC guidance.
It is a revision of IP17/01 which has been withdrawn.
The contents of the paper are:
- Introduction.
- Building Regulations.
- Numerical modelling.
- Limiting the risk of surface condensation or mould growth.
- Assessing thermal performance.
- References.
[edit] Related articles on Designing Buildings Wiki
- Accredited construction details ACDs.
- BRE articles.
- Building Research Establishment.
- Conventions for calculating linear thermal transmittance and temperature factors.
- Emission rates in the building regulations.
- Reducing thermal bridging at junctions when designing and installing solid wall insulation FB 61.
- Thermal bridge.
- Thermal imaging to improve energy efficiency in building design.
- Thermographic survey.
- U-values.
Featured articles and news
Noise in the built environment
BSRIA guide TG 20/2021.
17,000 people suffer conditions as a result of exposure to excessive noise at work.
Turning down the noise: Auditory health
A pervasive risk with far-reaching consequences.
UK Construction Week, London is here !
Debuting major international pavilions and much more.
Getting the most out of heat pumps and heating
How heat pumps work and how they work best.
Plumbing and heating for successful retrofit and renovation
Low temperature underfloor systems and heat pumps.
Cost-of-living crisis and home improvement plans
Starting on the right footing and top tips for projects.
Delays on construction projects
Types, mitigation and the acceleration of works.
From Chaucer to Fawlty Towers.
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.